by Matt Killorin | Jan 23, 2026
The reimagining of Kline Tower at the top of Yale’s Science Hill transformed the 106,000-square-foot, landmark 1966 structure from a wet-lab research facility into a vibrant hub for Yale’s physical and mathematical sciences. The LEED Gold–certified renovation...
by Matt Killorin | Jan 22, 2026
The Future Cancer Hospital, a partnership of the Dana-Farber Cancer Institute and the Beth Israel Deaconess Medical Center (BIDMC), comprises a 688,000-square-foot inpatient medical facility within Boston’s Longwood Medical Area. The structure features four...
by Matt Killorin | Jan 22, 2026
The 55,000-square-foot, four-story Arthur L. Irving Institute for Energy and Society is LEED Platinum certified and Dartmouth’s highest-performing, most energy-efficient building. Completed in 2022, the project transformed the Murdough Center’s outdoor...
by Matt Killorin | Jan 12, 2026
One Kenmore Square transforms Boston’s Beacon Street-Commonwealth Avenue intersection with two distinctive buildings totaling 330,000 square feet. The project required the demolition of three six-story structures and the renovation of two existing buildings...
by Matt Killorin | Oct 7, 2025
At sixteen stories and 260 feet tall, 400 Summer is a 630,000-square-foot mixed-use building of labs and offices with ground-floor retail atop three levels of below-grade parking. The project was built to suit Foundation Medicine, its primary tenant, which relocated...