by Matt Killorin | Aug 7, 2025
LeMessurier provided building enclosure consulting services for a three-story addition to the existing Thompson Arena. The project presented unique challenges in integrating modern enclosure requirements with the building’s midcentury wall assemblies. Design...
by Matt Killorin | Aug 7, 2025
LeMessurier conducted a comprehensive evaluation of 15 athletic facilities across Harvard University’s campus to develop a strategic rehabilitation priority ranking system. Building Envelope Assessment: Our team performed detailed inspections of each...
by Matt Killorin | Aug 7, 2025
The Portland Clubhouse on Cumberland Avenue, designed by John Calvin Stevens, has served the Boys & Girls Club of Southern Maine continuously since 1939. LeMessurier partnered with a local architecture firm to support their planned addition and renovation project....
by s2desi5_lemessurier | Apr 12, 2023
Ten months from the start of design, maroon and gold superfans funneled into a first-class 44,500-seat facility unrecognizable to most accustomed to the Big East’s smallest stadium. The daunting design and construction schedule for the renovation and addition required...
by s2desi5_lemessurier | Apr 12, 2023
Designing a new arena provides its own challenges, but shoehorning a multifunctional arena next to an adjacent active arena, two highways, a river, bridging an active train terminal and over subway tunnels, the planning, phasing and engineering become paramount. The...