by Matt Killorin | Aug 7, 2025
LeMessurier assessed the existing enclosure at Memorial Dining Hall as part of a larger effort to renovate the building. Through a comprehensive evaluation, our team identified critical areas requiring intervention while preserving well-performing assemblies. Building...
by Matt Killorin | Aug 7, 2025
Built in 1986, this eight-story, oceanfront condominium has battled persistent water infiltration issues. LeMessurier was hired by the condominium board to review past studies and develop a coordinated repair methodology. Document Analysis: Our team reviewed...
by Matt Killorin | Aug 7, 2025
LeMessurier conducted a comprehensive evaluation of the 130-foot stone masonry bell tower after the parish suffered multiple unsuccessful repair attempts. Our investigation focused on determining the root causes of ongoing structural issues and developing lasting...
by Matt Killorin | Aug 7, 2025
Reeds Brook Middle School, built in 1992, required a comprehensive building enclosure evaluation. LeMessurier conducted an enclosure study for Maine School Administrative District (MSAD) 22, identifying significant water damage and construction deficiencies. Building...
by s2desi5_lemessurier | Oct 11, 2022
LeMessurier was tasked to perform water infiltration testing on specific curtainwall assemblies at the Phelps Science Center at Phillips Exeter Academy, on areas that have shown sign of moisture infiltration during wind-driven rain events. The testing utilized...