loader image
Reeds Brook Middle School

Reeds Brook Middle School

Reeds Brook Middle School, built in 1992, required a comprehensive building enclosure evaluation. LeMessurier conducted an enclosure study for Maine School Administrative District (MSAD) 22, identifying significant water damage and construction deficiencies. Building...
60 Barra Lane

60 Barra Lane

LeMessurier provided window water testing services to verify installation quality and product performance. Window Testing Program: Our team conducted comprehensive water infiltration testing to validate window assembly installations and product performance....
Animal Garden

Animal Garden

LeMessurier engineered the building envelope system for the Museum of Science’s Animal Garden exhibit. The controlled environment, which maintains tropical conditions with elevated temperature and humidity levels, required specialized facade solutions. Through...
Peck Middle School

Peck Middle School

LeMessurier provided critical energy code compliance consulting for one of the first projects permitted under the Massachusetts Stretch Energy Code. Energy Code Compliance: Our team offered strategic guidance on project modifications to meet new requirements while...
Brimmer and May School

Brimmer and May School

When Brimmer and May School planned a major addition, LeMessurier joined the project team to ensure compliance with Massachusetts’ Stretch Building Code. Our comprehensive energy consulting and peer review services helped guide the project through enhanced...