by Matt Killorin | Aug 8, 2025
LeMessurier was contracted by Northeastern University to conduct a comprehensive assessment of this historic building’s facade system. The assessment included evaluation of the original turn-of-the-century stone masonry, 1960’s precast stones, and...
by Matt Killorin | Aug 7, 2025
LeMessurier joined a design team to evaluate seventeen campus buildings for energy consumption and operational carbon reduction opportunities. Building Assessment: Our team conducted initial visual assessments followed by nighttime infrared scanning of each building...
by Matt Killorin | Aug 7, 2025
Worcester City Hall stands as a political and architectural landmark in the city center. LeMessurier evaluated the building to improve thermal efficiency while preserving its historical character. Thermal Assessment: Using nighttime infrared scanning, our team...
by Matt Killorin | Aug 7, 2025
LeMessurier provided window water testing services to verify installation quality and product performance. Window Testing Program: Our team conducted comprehensive water infiltration testing to validate window assembly installations and product performance....
by Matt Killorin | Aug 7, 2025
LeMessurier engineered the building envelope system for the Museum of Science’s Animal Garden exhibit. The controlled environment, which maintains tropical conditions with elevated temperature and humidity levels, required specialized facade solutions. Through...